Project Phases
| Phase |
Description |
|
Preliminary Design |
AVAT
works with the client, architect, and other
team members to determine the scope of the
desired end solution. |
|
Engineering and Software Development |
Once
the client has reviewed and accepted the scope
of work, AVAT creates user interface graphics,
detailed engineering documents, subcontract
documentation, and software development for
the Top Level Integration (TLI). |
|
Construction Phase |
The
construction phase begins just prior to completion
of the framing and basic electrical. At this
point, drawings and subcontract documents
are used to procure qualified subcontractors.
Software development is ongoing throughout
this phase. |
|
System Test and Deployment |
The
subsystem controllers and all electronics
are installed and tested.
The individual subsystem controllers are analysed
and software and system development for the
TLI is completed. |
|
Installation and Commissioning |
The
AVAT Project Manager coordinates the installation
completion of the various subsystems and validates
and documents proper operation of each of
the subsystems. |
|
|